Case Studies
- Home
- Case Studies
Proven Solutions Across Industries
Real Case Studies, Real Impact
Don’t just take our word for it. Explore our detailed real-world case studies and discover how [Brand Name] delivers exceptional results across diverse projects and environments. From complex construction sites to large-scale industrial operations, see firsthand the efficiency, safety, and innovation we bring to every project.
- Partnering with industry leaders for trusted quality.
- Providing tailored solutions for unique challenges.
- Delivering proven efficiency with real-world data.
- Innovating with technology to empower future development.
- Backed by a global service network for strong support.



Global Collaboration, Co-creating Value
Jining Sitong is not just a manufacturer but a trusted partner. We delve into the complex application scenarios of different markets, from energy construction in Russia to infrastructure projects in Southeast Asia, from municipal engineering in the Middle East to environmental standards in Europe. We provide clients with high-performance, customized specialty vehicles. Each case study demonstrates how our innovative technology, rigorous quality, and global service network help clients overcome challenges, enhance efficiency, reduce total operating costs, and achieve mutual success.
Global Market & Social Proof
Trusted by Clients Worldwide
- 28 provinces and 500+ cities in China
- Exported to 50+ countries and regions
- 500+ long-term clients worldwide
- Reliable performance and excellent service

The Client
Russia Case Study - Detailed
Our client is a leading energy infrastructure construction company in Russia, specializing in oil and gas field development, pipeline laying, and large-scale industrial facility construction. Their projects are often located in remote areas with harsh climates and sparse population.
The Challenge
The Primary Hurdles to Project Success
- Winter temperatures can plummet to -35°C, causing hydraulic systems and engines of standard equipment to fail to start or operate normally.
- The project window is short. Any equipment downtime leads to significant financial losses and project delays.
- The brittleness of equipment materials increases in extreme cold, posing severe challenges to equipment and operational safety.
Our solutions
The Plan We Built for Them
- We recommended the [Jining Sitong] STQ Series Truck Crane for its robust power base and exceptional structural reliability.
- Provided a Extreme Cold Weather Package for this project, including:
- Ultra-low temperature starting devices (pre-heating systems).
- Low-temperature resistant steel and seals.
- Special hydraulic oil for environments down to -50°C.
- Reinforced heated cabin for operator comfort.
The Results
Efficiency Delivered
- Equipment attendance rate increased to 98%, far exceeding the client's expectation of 85%.
- Project critical phase duration was reduced by 15%, saving the client significant time costs.
- Unexpected maintenance costs were reduced by 40% due to high equipment reliability.
Contact Us
Not Seeing Your Specific Application
Our engineering team specializes in designing and delivering customized lifting solutions tailored to meet the specific needs of each project. We work closely with clients to understand their challenges and provide efficient, safe, and reliable solutions. Let’s discuss your requirements.